Control panel and E&I, England


For an end-user in England, ABC-Techniek is commissioned to fabricate a control panel for a biogas installation that is used for a whisky factory. The control panel is going to be built in a container and will be placed next to the factory. This particular biogas installation has the capacity of 1200 Nm3/h and is able to generate the biogas to natural gas quality.

Our activities:

  • Fabrication and assembly of the control panel
  • FAT (Factory Acceptance Test) and communication test with the end user.

In addition to fabrication and delivery of the control panel, ABC-Techniek is also assigned to perform E&I activities onsite. The installation is going to be built in a container and will be classified as ATEX zone 1.